Bathroom remodeling projects remain to be one of the most distinguished of all home remodelings. And it’s understandable to see why nothing is cozier or more hospitable than a smartly updated, refurbished, freshly remodeled bathroom. Also, bath remodeling is a wise investment if you intend to sell your house in the next few years.

There’s no secret formula to building the ideal bath. But, you can considerably improve your chances of achievement by following these seven steps we have summarised below.

  • Build Your Bathroom Makeover Design

Before doing any bathroom renovation yourself, you should finalize a new design. It would be best if you went for a design that matches your perception and skillset. There are numerous different ways to do a bathroom remodel. Here are some design components you require to nail down before starting your bathroom renovation:

  • Colour scheme: Know before time to ensure that your new bathroom tiles don’t crash with the paint you chose.
  • New fixtures: Decide either you will remodel or replace your shower/tub? Are you inducting a new sink? Replacing these fixtures will amplify your project budget and time.
  • Storage spaces: Storage spaces are significant. Suppose you’re eliminating a closet to broaden the room. Ensure that you have shelving to make up for the missing storage space in your bathroom.
  • Location of utilities: Make sure you have proper measurements for plumbing pipes and electrical wiring. By doing this, you don’t end up requiring costly repairs.
  • Create A Realistic Budget

Remodeling a bathroom can be an expensive, complicated project. It needs detailed planning, a prolonged timetable. Furthermore, it also requires careful coordination of many different trades, such as carpenters, plumbers, tile contractors, and electricians.

The simplest way to create a budget is to get remodeling services or hire a professional designer. They will plan the new bathroom that will go with your budget. Also, they will guide you through every remodeling phase. The only con of this idea is it will increase your budget because of the designer’s cost. The designer’s cost entirely depends on the scope and size of the project. 

  • Order Bathroom Remodeling Materials

It is best to order materials as soon as possible. These materials include: 

  • Tiling.
  • Countertop.
  • Fixtures (showerhead, faucet).
  • Cabinetry (a new vanity, linen closet). 
  • Hardware ( cabinet handles, drawer pulls).

Some products take so long to deliver, and if you order a custom-made product, they can take even longer. It plays a significant role in delaying a project. If you don’t get the necessary items, the installation will be delayed. If you get the products and materials before the work starts, store them in a basement or garage.

If you have hired a remodeling contractor, they can also guide you when to order the things you will require. Depending on the service, they can also assist you in the ordering and shopping process. 

  • Demolishing Your Old Bathroom

Many people consider demolition to be the most exciting part of the bathroom renovating process. Though, doing it with no proper planning can make it terrible. First, make sure that you disconnect the water supply and electricity to the sink, bathtub, shower, and toilet. Be careful about not damaging any elements that you will surely need later on.

While taking the wall tile down, take special care about not damaging the underlying wiring or piping in the walls. Cautiously take the sink and toilet out without cracking them. Also, make sure to inspect for mildew or mold growths underneath and water damage. Remove towel racks, baseboards, lighting fixtures, and all other fixtures from the bathroom.

Bathroom remodeling

  • Install New Plumbing Fixtures

After removing all the old fixtures, you can put In the new fixtures—for example, the shower, bathtub, or sink. Do not induct the toilet in this step. Please keep it for last. You may require to adjust the bathroom wiring that depends on the measurements of the new fixtures. 

For example, your new vanity is tall enough and covers up the electrical sockets. It means you need to move the sockets. If this is the case, get an electrician to help with your house’s wiring to prevent any electrical accidents.

  • Install Wall And Floor Finishes

The next step in a basic renovation is to introduce the floor and wall finishes. The general order is:

  • Install cement sheet or plasterboard.
  • Waterproofing.
  • Tiling.
  • Grouting.
  • Painting.

Not all tilers are waterproof, and not all waterproofs are tiles. You need to make sure that you understand what each of your trades can and cannot do. The plumbers often encounter leaks in walls or ceiling cavities due to improper waterproofing. 

  • Make A Post-Completion Punch List

A lot of times, materials came scratched or broken or not at all. Sometimes there’s a mark on the wall, or the caulk is too dirty. Lastly, now is the time that you make a list of this stuff. You can do it either in a casual email or a more formal statement with your contractor. Please give it to anyone responsible for fixing the errors and include a date by which the finish and fix-ups work should be finalized.

Conclusion 

A bathroom is one of the time-intensive programs on the front end. It is because of things like room flow, electrical, materials, functionality, and more. If you develop your bathroom plan already, get the proper process to help. Also, it would help if you made an effort to stick to a budget and project. It can give rise to a much smoother procedure in the long run. Moreover, it will upgrade one of the most utilized rooms in your home.